Eastern Province Crude & Gas Gathering Network

Operational Status & Shutdown Review Interface

Shedgum TAR Active Abqaiq Online
Abqaiq Stabilisation Throughput
7.00MMbpd
Core Central Gathering Node
Ras Tanura Loading
6.50MMbpd
Sea Islands & Terminal Jetties
Ju'aymah Offshore Loading
3.00MMbpd
Deepwater Single Point Moorings (SPMs)
Shedgum Gas Plant Status
SHUTDOWN
Major Turnaround (TAR) in Progress
Crude Gathering & Gas Integration Flow
GH
Ghawar Field (Upstream GOSPs)
Unstabilised Arab Light / Extra Light Crude & Associated Wet Gas
Basin Feed
↓ Ghawar–Abqaiq Gathering Trunkline (Multi-phase & Sour Liquids)
AB
Abqaiq Plants (Central Stabilisation & Spheroids)
CRITICAL NODE: H₂S stripping, RVP control, NGL extraction
7.0 MMbpd
↓ Dual Export Trunklines (Stabilised Crude) & Associated Offgas Transfer
RT
Ras Tanura Terminal
Primary Marine Hub
6.5 MMbpd
JU
Ju'aymah Terminal
SPM Offshore Berth
3.0 MMbpd
SH
Shedgum Gas Plant
Offline (Turnaround)
0 MMSCFD
UT
'Uthmaniyah Gas Plant
Online (Absorbing Feed)
High Load
Shutdown Risk & Vulnerability Review
⚠️ Primary SPOF: Abqaiq Stabilisation
Raw crude from Ghawar contains high H₂S and high Reid Vapour Pressure (RVP). It cannot bypass Abqaiq directly to tankers without causing severe vaporisation and safety violations during marine loading.
ℹ️ Gas Constraint (Shedgum TAR)
With Shedgum shut for turnaround, associated off-gas handling and acid gas treating redundancy is constrained, lowering margin for stabiliser column gas upsets.
Asset Register & Status
Asset Role Status
Ghawar Production Field Normal
Abqaiq Crude Stabilisation 7.0 MMbpd
Shedgum Associated Gas Plant Turnaround
'Uthmaniyah Associated Gas Plant Online
Ras Tanura Marine Terminal 6.5 MMbpd
Ju'aymah Offshore SPMs 3.0 MMbpd